AIRPORTS/ HANGARS/ MAINTENANCE |
|
|
|
|
|
|
|
|
| |
|
|
|
C-130 HANGAR
DAVIS MONTHAN AFB, AZ |
 |
Design-Bid-Build
New Construction
Contract Value:
$11.6 million
Straub team constructed a pre-engineered metal hangar for C-130 aircraft with a large administrative area located around two sides of the facility. The building has a partial masonry veneer and metal siding with a standing seam metal roof. The building ties into the existing taxi-way.
CCASS Rating: Outstanding
“The Straub team brought this project in ahead of schedule, under budget and with zero safety incidents…the dedicated efforts of the team filled a 28-year gap in our group’s mission needs with an impressive, state of the art maintenance complex.” |
|
| |
|
|
|
AIRCRAFT MAINTENANCE COMPLEX
NELLIS AFB, NV |
 |
Design-Bid-Build
New Construction
Contract Value: $11.6 million
The scope of work consists of construction of an approximately 18,202 sf fuel cell maintenance hangar with reinforced concrete foundation and floor slab, structural steel frame, standing seam metal roof, fire detection/protection including high expansion foam system, utilities, site improvements, and access road, hangar apron access pavements/lighting, markings, and communication support.
CCASS Rating: Above Average
Awards:
AGC Safe Site Award |
|
| |
|
|
|
AIRCRAFT MAINTENANCE HANGAR/ SQUAD OPERATIONS
NELLIS AFB, NV |
 |
Design-Bid-Build
New Construction
Contract Value: $24.9 million
The scope of work consists of construction of a 13,748 SF Squadron Operations Facility and a 41,244 SF Aircraft Maintenance Unit (AMXU) Facility with 4-bay high hangar to support the BRAC directed beddown of F-15C/D and F-16 aircraft. The Squadron Operations/ AMXU facilities support mission planning, flight operations, direct flightline maintenance functions, mission briefs and debriefs, and squadron administrative support functions. The high bay hangar supports the direct maintenance of the F-15C aircraft.
CCASS Rating: Outstanding |
|
| |
|
|
|
FLIGHT SIMULATOR
NELLIS AFB, NV |
 |
Design-Bid-Build
New Construction
Contract Value:
$8.2 million
Straub was responsible for building a 15,931 SF permanent four-cockpit flight simulator facility to support realistic pilot training on F-15C/D and F16 aircraft. Consisted of a reinforced concrete foundation and floor slab, metal building system over concrete masonry block walls, fire detection system and other protection utilities, landscaping, access road and parking, and communications support.
CCASS Rating: Outstanding
Awards:
AGC Safe Site Award |
|
| |
|
|
|
557th DS VEHICLE MAINTENANCE FACILITY
FORT IRWIN, CA |
 |
Design-Bid- Build
New Construction
Contract Value: $14.9 million
Project entailed construction of a 59,000 SF vehicle maintenance facility consisting of maintenance shop, unit deployment storage and break shelter buildings; guardhouse; two-bay wash rack facility; and about 1,400,000 SF for hardstand parking.
CCASS Rating: Above Average |
|
| |
|
|
|
VEHICLE MAINTENANCE COMPLEX
NELLIS AFB, NV |
 |
Design-Build
Architect: KMA Architects
New Construction / Renovation
Contract Value: $11.1 million
The complex consists of four buildings (63,203 SF): a maintenance facility designed for the repair and maintenance of a variety of wheeled vehicles; renovation and repair of an existing vehicle maintenance facility; alteration of an existing maintenance building; and alteration of an existing distinguished visitor operations building. The scope also included construction of a drive-through vehicle wash rack accommodating pickup trucks and HMMV's and a new loading dock.
CCASS Rating: Outstanding
“Straub’s entire staff is committed to taking safety beyond the minimum standard set by OSHA.”
Tory McKnight , AGC Safety Inspector
Vehicle Maintenance Complex,
Nellis AFB |
|
| |
|
|
|
CONSOLIDATED COMMUNICATIONS/ELECTRONICS MAINTENANCE SHOP
MCB CAMP PENDLETON, CA |

|
Design-Build
Architect: GMH Associates
New Construction
Contract Value: $8.6 million
The 23,935 SF single-story, High Bay Communication/ Electronics Maintenance Shop is a CMU building with conventional reinforced concrete footing and slab-on-grade, factory-finished standing seam metal roofing over structural steel framing, steel doors and frames, finished gypsum board over metal stud interior partitions, and suspended acoustical ceiling systems. Functional spaces for the ECMS include maintenance areas for the Communications/ Electronics shop, computer classroom, and telecommunication room. Built-in equipment includes vehicle exhaust system.
CCASS Rating: Outstanding |
|
| |
|
|
|
UNMANNED AERIAL VEHICLE COMPLEX (UAV)
CREECH AFB, NV |
 |
Design-Bid-Build
New Construction
Contract Value: $14.6 million
Five major buildings totaling 73,000 square feet; including a squadron operations facility with an open-bay hanger facility, communications maintenance facility, logistics facility, aerospace ground maintenance facility, and storage facility. Construction elements included a pre-engineered steel frame structure with reinforced load bearing concrete masonry unit walls; non-structural metal roof panels and siding with girder trusses and open web steel joists; cast-in-place concrete with cantilevered rack systems; monorails with hoist and a 570,000-liter elevated water storage tank.
|
|
| |
|
|
|
|
|
 |
 |
 |
 |
 |
 |
| Copyright © 2010 Straub Construction, Inc. |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|