Design/Build Commander, Mine Warfare Command HQ

Please mail
any comments to:

 Rick.Garcia@straubinc.com

License:
CA 506797  NV 46120  AZ 164996

 

Design/Build Commander, Mine Warfare Command HQ

San Diego, CA

Bid date: 5/7/08, 4/30/08, 4/24/08, 4/16/08, 4/2/08, 3/18/08, 2:00 pm (Local Time) PST

 Design/Build Commander, Mine Warfare Command HQ


Design/Build Commander, Mine Warfare Command HQ, Fleet Antisubmarine Warfare Naval Base Point Loma, San Diego, CA
Bid date: 5/7/08, 4/30/08, 4/24/08, 4/16/08, 4/2/08, 3/18/08, 2:00 pm (Local Time) PST


ADDENDA:

PROJECT INFORMATION:

  • Site Address: Buildings 1 and 11, Anti-Submarine Warfare (ASW) Point Loma, San Diego, CA. Google Earth Coordinates: 32 deg 43' 29.88"N; 117 deg 13' 13.04"W
  • Download wage rates (CA 080001 Amendment 6 dated 4/4/08) here
  • Completion Time: 730 calendar days. Liquidated damages: $8035/day.
  • Cost Estimate: $16M
  • Number of Bid Items: 2 base bid line items (w/ 4 sub items) per Addm7
  • List Subs? No
  • Technical Proposal Required from GC: Yes  [The Government will need about 1 month to review hard bids and technical proposals, which means that no G.C. will be giving out bid results during that time. -- PLEASE DO NOT CALL FOR BID RESULTS UNTIL AFTER 1 MONTH AFTER BID DATE.]
  • The work includes the design and construction/renovation of various administrative facilities with reinforced concrete foundation and structure compliant with current California seismic codes to provide Seismic Upgrades, Security upgrades, various miscellaneous renovations associated with change of building occupants and Fixtures, Furnishings & Equipment (FF&E). Exterior finishes will complement installation architectural standards. Design to comply to (but not limited to) the following; the Unified Facilities Criteria (UFC) designated in Section 01331 of the technical specification, DoD Antiterrorism/Force Protection standards (UFC 4-010-01), the Uniform Federal Accessibility Standards/Americans with Disabilities Act Accessibilities Guidelines and the references as provided in Part 4 of the technical specification.
  • Site Visit for GCs? Yes, on 3/5/08., 9:00 a.m. at FEAD Point Loma, San Diego, CA
  • Click here to download Spec Table of Contents
  • Click here to download Plan Index Sheet
  • Click here to view, download or order plan/spec set (or individual pages) online. You will need the latest Bidmail viewer and a Bidmail User ID and Password to access this information. Note: You will need to make sure your browser is set to "Medium High" privacy to allow for cookies.
  • Entire plans/specs/addenda can also be downloaded from our new FTP site at: https://straubinc.sharefile.com . Please contact Rebecca Ferrell for username and password.
  • Please contact Straub's preconstruction coordinator, Rebecca Ferrell, for cdrom of downloaded PDF plans/specs.

AERIAL PHOTO:

 


Please mail any comments to Rick.Garcia@straubinc.com
 

   Home        Contact Us       Projects       Upcoming Bids       Industry       Human Resources
Phone (760) 414-9000 Fax (760) 414-9100   Email info@straubinc.com
© Straub Construction 1998-2008 Site created by THEEBC.com