Design/Build Operations Storage Facility

Please mail
any comments to:

 Rick.Garcia@straubinc.com

License:
CA 506797  NV 46120  AZ 164996

 

Design/Build P-783 SBT-12 Operations Storage Facility

Naval Amphibious Base, Coronado, CA

Bid date: 5/20/08, 5/13/08, 2:00 pm (Local Time) PST

 Design/Build P-783 Special Boat Team-12 Operations Storage Facility


N62473-07-D-2002, X008, Naval Special Warfare Group-4 Storage Facility, Coronado, CA
Bid date: 5/20/08, 5/13/08, 2:00 pm (Local Time) PST


ADDENDA:

  1. Addendum 1 dated 5/6/08 (23kb)

  2. Addendum 2 dated 5/7/08 (25kb)

  3. Addendum 3 dated 5/14/08 (20kb)

  4. Addenda 1-3 specs and drawings will be posted here at our new FTP site at: https://straubinc.sharefile.com . Please contact Amanda Holmes for username and password.

PROJECT INFORMATION:

  • Site Address: Tarawa Road/ Kwajalein Road, Coronado, CA 92135. Google Earth Coordinates: 32 deg 40' 41.13"N; 117 deg 9' 34.55"W
  • Download wage rates (CA080001 dated 4/11/08) here
  • Completion Time: 555 calendar days. Liquidated damages: $4950/day.
  • Cost Estimate: $10.5M
  • Number of Bid Items: 1 base bid line item + 2 options
  • List Subs? No
  • Technical Proposal Required from GC: Yes  [The Government will need about 1 month to review hard bids and technical proposals, which means that no G.C. will be giving out bid results during that time. -- PLEASE DO NOT CALL FOR BID RESULTS UNTIL AFTER 1 MONTH AFTER BID DATE.]
  • The Using Activity fLor this project is planned to be: NAVAL SPECIAL WARFARE GROUP FOUR (NSWG-4). Project includes construction of a two-story (37730 s.f.) operational storage facility; with associated utilities, fire protection, local area network (NIPR and SIPR), heating, ventilation- air conditioning/humidity control. The facility includes open storage areas, secure storage rooms for each detachment, showers and restrooms, a duty watch station, a bunk room, and laundry areas. Information systems include computer and telephone wiring. Built-in equipment includes wall lockers. Special Construction Features include provision of a temporary facility (7412 s.f.) and associated utility connection costs; see Part 2, Section 01 50 00.05 20 TEMPORARY FACILITIES AND CONTROLS FOR DESIGN-BUILD. Paving and Site Improvements features include new asphalt areas, resurfacing of asphalt, sidewalks and other concrete areas, landscape planters, fencing, outdoor rinsing shower, and storm water BMPs. Equipment from other appropriations includes gear cages, drying cages, laundering facilities, Physical Security Equipment (PSE) (to include Intrusion Detection System (IDS), Access Control System (ACS) and Closed Circuit Television (CCTV), C4ITI, bunks, and a duty watch station. This project will demolish Buildings Q100 (508 m2) and Q102 (861 m2); a total area of 1,369 m2. This project will also demolish an adjacent existing concrete paved area along with associated drainage piping.
  • Site Visit for GCs? Yes, on 4/24/08, 9:30 a.m. at Naval Base Coronado
  • Click here to download Spec Table of Contents
  • Click here to download Plan Index Sheet
  • Click here to view, download or order plan/spec set (or individual pages) online. You will need the latest Bidmail viewer and a Bidmail User ID and Password to access this information. Note: You will need to make sure your browser is set to "Medium High" privacy to allow for cookies.
  • Entire plans/specs/addenda can also be downloaded from our new FTP site at: https://straubinc.sharefile.com . Please contact Amanda Holmes for username and password.
  • Please contact Straub's preconstruction coordinator, Amanda Holmes, for cdrom of downloaded PDF plans/specs.

AERIAL PHOTO:

 


Please mail any comments to Rick.Garcia@straubinc.com
 

   Home        Contact Us       Projects       Upcoming Bids       Industry       Human Resources
Phone (760) 414-9000 Fax (760) 414-9100   Email info@straubinc.com
© Straub Construction 1998-2008 Site created by THEEBC.com