PUBLIC/ EDUCATIONAL |
|
|
|
|
|
|
|
|
|
|
|
|
SANTA MARIA PUBLIC LIBRARY
SANTA MARIA, CA |
 |
Design-Bid-Build
New Construction
Contract Value:
$18.6 million
This project involved new construction of a 59,850 SF multi-story facility including a library, administration area, seating areas for 300 and 77 computer stations. This steel-framed structure building with a concrete slab on grade foundation has a metal panel exterior and steel joist roof deck and structure and a roof of standing seam metal with clay roofing tile accents. Other project features include an elevator, a package air conditioning/heat pump system, landscaping, irrigation systems, handicap access, fire alarms and fire sprinklers throughout.
Award:
2008 Excellence in Construction Award, Associated Builders & Contractors, San Diego Chapter
“On behalf of the City of Santa Maria and the City Council, please accept my strong appreciation for Straub Construction’s tremendous professionalism in constructing our new Santa Maria Public Library. The City depended on your team’s diligence and cooperation to ensure that this project was completed to the City’s exacting standards … The building is first-class.” |
|
| |
|
|
|
RED ROCK CANYON VISITOR CENTER
RED ROCK CANYON, NV |
 |
Design-Bid-Build
New Construction
Contract Value: $15.1 million
Project calls for construction of a 1,250 SF contact/fee station and 8,200 SF visitors arrival station, as well as remodel of a 7,200 SFR administration building and rehabilitation of as 1,100 SWF restroom facility. Includes landscaping and hardscaping, shade structures and exhibit, support structures and landscape retaining walls. Both the visitors center and administration building will adhere to U.S. green building requirements.
Awards:
2010 National Excellence in Construction - Pyramid Award
Associated Builders & Contractors
2010 Best Green Building
Southwest Contractors - Best of Nevada
2010 Excellence in Construction Award
Associated Builders & Contractors, San Diego Chapter |
|
| |
|
|
|
UCSD STUDENT CENTER EXPANSION
LA JOLLA, CA |
 |
Design-Bid-Build
New Construction
Contract Value: $5 million
Straub served as prime contractor for the project, which involved construction of two, two-story buildings totaling 13,593 SF at the original student center. The buildings were designed to house student resource centers and a new café/lounge terrace/dining area in the form of a living room with a bank of lounge chairs, a multi-media conference room, a 3,000-book library, kitchen and counseling room, as well as offices and conference space. The project also included space for a Women’s Center, which is a 24-hour student study lounge, and the David Bohnett Wireless CyberCenter.
Award: 2006 National Excellence in Construction Eagle Award,
Institutional Associated Builders & Contractors, San Diego Chapter
“The Straub team performed exceptionally well under difficult conditions in completing the project and exceeding our expectations along the way. The finished product well exceeded our expectations in execution, performance and quality.” |
|
| |
|
|
|
ALLEN HANCOCK COMMUNITY COLLEGE SCIENCES AND
HEALTH OCCUPATION BUILDING
SANTA MARIA, CA |
 |
Design-Bid-Build
New Construction
Contract Value:
$16.3 million
Project involved construction of a two-story, 44,302 SF, steel-framed building with metal stud interior walls, a plaster exterior with split face block accents, and a flat roof with single-ply roofing and standing metal seam accents. The complex houses science laboratories, math and engineering computer laboratories, classrooms, faculty offices and health occupations program facilities. The job included demolition of 10,562 SF of the older labs and conversion of 3,779 SF of instructional space to storage space.
Awards:
Recipient of a 2008 Excellence in Construction Award from the Associated Builders & Contractors,
San Diego Chapter
“The company produced quality work, maintained cooperative working relationships, displayed a strong desire and determination to complete this difficult and complicated project in a timely manner, with the highest quality possible … Straub Construction, Inc. demonstrated great team spirit and unity to this project and the district is extremely pleased with the building and the facility users will enjoy the new facility for many years to come. |
|
| |
|
|
|
CUESTA COLLEGE LIBRARY EXPANSION
SAN LUIS OBISPO, CA |
 |
Design-Bid-Build
New Construction
Contract Value: $13.2 million
Construction of a 45,007 gross SF, two-story addition to the Cuesta College's main library and student services facility, which included a remodel of the existing library and new construction, including office spaces, lecture and meeting areas, reading areas and library stacks. Project also included utility relocation and redirection of voice/data transmission from the campus’ main distribution frame in the library. |
|
| |
|
|
|
CAMPO ELEMENTARY SCHOOL
CAMPO, CA |
 |
Design-Bid-Build
New Construction
Contract Value: $3.76 million
Campus included over 24,000 square feet of classroom and administrative buildings. School was completed in 360 days meeting both schedule and budget allocations.
|
|
| |
|
|
|
LOBO ELEMENTARY SCHOOL
SAN CLEMENTE, CA |
 |
Design-Bid-Build
New Construction
Contract Value: $5.8 million
Elementary school built for the Capistrano Unified School District. Over 34,000 square feet primarily under one roof. Project was completed on schedule in 371 days
|
|
| |
|
|
|
CALIFORNIA POLYTECHNIC INSTITUTE
PHASE 2B RENOVATION AND REPLACEMENT
SAN LUIS OBISPO, CA |
 |
Design-Bid-Build
New Construction
Contract Value: $23.9 million
The project consists of four structures; one one-story building and three three-story buildings, connected by exterior walkways (56,332 square feet of new building construction and 26,000 square feet of renovation to Building 21). The buildings have drilled pier slabs on grade foundations, with a steel brace frame structure. The exterior of the buildings include glass curtain walls, ribbed metal, pre-cast panels and one common elevator. Renovation portion of contract involved three existing instructional buildings and one new exterior elevator.
|
|
| |
|
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
 |
 |
 |
 |
 |
 |